United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

SOLAR Β· PJM

Solar project AH1-451

Solar project AH1-451 is a 180 MW solar request withdrawn in the PJM interconnection queue, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-451
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Hopkins 138 kV
Location
West Virginia
Technology
Solar: 180 MW
Total requested
180 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
11 September 2021
Proposed online date
May 2025
Withdrawn
December 2024

Location

No county location in the queue data.

Power plants in West Virginia Β· Transmission lines in West Virginia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem