Solar + storage project 98, Grant County

Solar + storage project 98, Grant County is a 80.0 MW solar + storage request withdrawn in the West interconnection queue, in Grant County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
98
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Stratford 115 kV Station
Location
Grant County, Washington
Technology
Solar: 80.0 MW Β· Battery
Total requested
80.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
29 August 2019
Proposed online date
December 2023

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County