United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

SOLAR Β· MISO

Solar project J2271, Columbia County

Solar project J2271, Columbia County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Columbia County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2271
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
South Fond du Lac to Columbia 345 kV
Location
Columbia County, Wisconsin
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: Re-Study; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
21 July 2021
Proposed online date
January 2025
Withdrawn
October 2024

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem