Replace 49 MW of GRE.ELKRI1 Unit with Gas/Oil; Elk River 1

Replace 49 MW of GRE.ELKRI1 Unit with Gas/Oil; Elk River 1 is a 49.0 MW gas request withdrawn in the MISO interconnection queue, in Sherburne County, Minnesota, connecting to GREAT RIVER ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1005
Grid region
MISO (Midcontinent)
Utility / transmission owner
GREAT RIVER ENERGY
Connection point (POI)
Elk River Station: S6 69 kV
Location
Sherburne County, Minnesota
Technology
Gas: 49.0 MW · Oil · Other
Total requested
49.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
19 January 2021
Proposed online date
March 2022

Location

Marker shows the centre of Sherburne County; the queue data does not give exact sites.