United States βΊ Grid βΊ Interconnection queues βΊ Iowa
SOLAR + STORAGE Β· MISOSolar + storage project J3088, Woodbury County
Solar + storage project J3088, Woodbury County is a 300 MW solar + storage request withdrawn in the MISO interconnection queue, in Woodbury County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3088
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Raun to Sioux City
- Location
- Woodbury County, Iowa
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- February 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Woodbury County; the queue data does not give exact sites.
Other requests in Woodbury County
- Gas project GEN-2019-019, Woodbury CountyGas Β· 15.2 MW Β· agreement signed
- Coal project J279, Woodbury CountyCoal Β· 30.0 MW Β· built
- Coal project J358, Woodbury CountyCoal Β· 280 MW Β· withdrawn
- Gas project J359, Woodbury CountyGas Β· 232 MW Β· withdrawn
- Coal project J357, Woodbury CountyCoal Β· 135 MW Β· withdrawn
- Onshore wind project J2352, Woodbury CountyOnshore wind Β· 118 MW Β· withdrawn
- Onshore wind project J253, Woodbury CountyOnshore wind Β· 48.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem