United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G587, Sibley County

Onshore wind project G587, Sibley County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Sibley County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedDec 2015 (project stopped here)
  3. ConsentedJun 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G587
Grid region
MISO (Midcontinent)
Connection point (POI)
69 kV to Winthrop Sub
Location
Sibley County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
DPP - SIS
Queue status
Withdrawn
Entered queue
30 December 2005
Agreement signed
24 June 2009
Proposed online date
January 2010
Withdrawn
December 2015

Location

Marker shows the centre of Sibley County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Sibley County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem