United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AD2-201, Appomattox County
Solar project AD2-201, Appomattox County is a 62.0 MW solar request withdrawn in the PJM interconnection queue, in Appomattox County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD2-201
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- South Creek 115 kV
- Location
- Appomattox County, Virginia
- Technology
- Solar: 62.0 MW
- Total requested
- 62.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2018
- Proposed online date
- March 2020
- Withdrawn
- April 2018
Location
Marker shows the centre of Appomattox County; the queue data does not give exact sites.
Other requests in Appomattox County
- Solar project AG2-367, Appomattox CountySolar Β· 100 MW Β· withdrawn
- Caden Energix Spout SpringSolar Β· 60.0 MW Β· withdrawn
- Solar project AD1-161, Appomattox CountySolar Β· 55.0 MW Β· withdrawn
- Solar project AG2-133, Appomattox CountySolar Β· 52.4 MW Β· withdrawn
- Pamplin SolarSolar Β· 15.7 MW Β· withdrawn
- Spout Springs SolarSolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem