United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMOnshore wind project W3-046, Mason County
Onshore wind project W3-046, Mason County is a 208 MW onshore wind request withdrawn in the PJM interconnection queue, in Mason County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2010 (completed)
- Withdrawn / abandonedMay 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W3-046
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Powerton 345kV
- Location
- Mason County, Illinois
- Technology
- Wind: 208 MW
- Total requested
- 208 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 August 2010
- Proposed online date
- December 2015
- Withdrawn
- May 2018
Location
Marker shows the centre of Mason County; the queue data does not give exact sites.
Other requests in Mason County
- Solar project J2603, Mason CountySolar Β· 320 MW Β· in study
- Onshore wind project J2963, Mason CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J3519, Mason CountyOnshore wind Β· 200 MW Β· in study
- Solar + storage project J3003, Mason CountySolar + storage Β· 180 MW Β· in study
- Solar + storage project J3004, Mason CountySolar + storage Β· 142 MW Β· in study
- Onshore wind project J1453, Mason CountyOnshore wind Β· 188 MW Β· built
- Onshore wind project J1055, Mason CountyOnshore wind Β· 144 MW Β· built
- Onshore wind project J1454, Mason CountyOnshore wind Β· 58.5 MW Β· built
- Solar project J3475, Mason CountySolar Β· 200 MW Β· withdrawn
- Battery storage project J2842, Mason CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project J3809, Mason CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar + storage project J3005, Mason CountySolar + storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem