BATTERY STORAGE Β· MISO

Battery storage project J2503, Lincoln Parish County

Battery storage project J2503, Lincoln Parish County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Lincoln Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2503
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
Downsville - Ruston East 115 kV
Location
Lincoln Parish County, Louisiana
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
October 2026
Withdrawn
March 2023

Location

Marker shows the centre of Lincoln Parish County; the queue data does not give exact sites.