Damon BESS3

Damon BESS3 is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusConsented
  1. Planning (completed)
  2. ConsentedJan 2024 (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0790
Grid region
ERCOT (Texas)
Developer
BarBar Storage LLC
Connection point (POI)
Station Name: DAMON TSP Station Code: DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV Node (associated w/ load/load XFRM in NMMS): TR2
Location
Brazoria County, Texas
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
IA Executed
Queue status
Active
Agreement signed
30 January 2024
Proposed online date
December 2025

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem