United States › Grid › Interconnection queues › Indiana
BATTERY STORAGE · MISOBattery storage project J3948, Posey County
Battery storage project J3948, Posey County is a 200 MW battery storage request in interconnection study in the MISO interconnection queue, in Posey County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3948
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- AB Brown 345 - Gibson (Duke Terminal) 345.0kV
- Location
- Posey County, Indiana
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 25 March 2025
- Proposed online date
- September 2030
Location
Marker shows the centre of Posey County; the queue data does not give exact sites.
Other requests in Posey County
- Solar project J1308, Posey CountySolar · 300 MW · agreement signed
- Solar project J2970, Posey CountySolar · 250 MW · in study
- Gas project J708, Posey CountyGas · 847 MW · withdrawn
- Battery storage project J3424, Posey CountyBattery storage · 300 MW · withdrawn
- Gas project G053, Posey CountyGas · 260 MW · withdrawn
- Battery storage project J3248, Posey CountyBattery storage · 250 MW · withdrawn
- Solar project J3414, Posey CountySolar · 200 MW · withdrawn
- Solar + storage project J1274, Posey CountySolar + storage · 100 MW · withdrawn
- Solar + storage project J1276, Posey CountySolar + storage · 100 MW · withdrawn
- Gas project J332, Posey CountyGas · 90.0 MW · withdrawn
- Gas project J1148, Posey CountyGas · 54.0 MW · withdrawn
- Solar project J3491, Posey CountySolar · 45.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem