United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AG1-538, Culpeper County
Battery storage project AG1-538, Culpeper County is a 75.0 MW battery storage request withdrawn in the PJM interconnection queue, in Culpeper County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-538
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Longleaf Storage, LLC
- Connection point (POI)
- Remington-Gordonsville 230 kV
- Location
- Culpeper County, Virginia
- Technology
- Battery: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- October 2024
- Withdrawn
- June 2024
Location
Marker shows the centre of Culpeper County; the queue data does not give exact sites.
Other requests in Culpeper County
- Greenwood SolarSolar Β· 100 MW Β· agreement signed
- Cricket SolarSolar Β· 60.0 MW Β· agreement signed
- Greenwood SolarSolar Β· 50.0 MW Β· agreement signed
- Cricket SolarSolar Β· 20.0 MW Β· agreement signed
- Maroon SolarSolar Β· 149 MW Β· suspended
- Solar project AH1-437, Culpeper CountySolar Β· 150 MW Β· withdrawn
- Solar project AC2-121, Culpeper CountySolar Β· 150 MW Β· withdrawn
- Solar project AC2-022, Culpeper CountySolar Β· 100 MW Β· withdrawn
- Solar project AC2-102, Culpeper CountySolar Β· 80.0 MW Β· withdrawn
- Elkwood SolarSolar Β· 60.0 MW Β· withdrawn
- Battery storage project AE2-188, Culpeper CountyBattery storage Β· 40.0 MW Β· withdrawn
- Solar project AB2-052, Culpeper CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem