United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· MISOSolar + storage project J2803, Carroll County
Solar + storage project J2803, Carroll County is a 150 MW solar + storage request withdrawn in the MISO interconnection queue, in Carroll County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2803
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- Winona (3WINONA! 337060) - Carrollton (3CARROLLTON+ 337056) 115 kV
- Location
- Carroll County, Mississippi
- Technology
- Solar: 150 MW Β· Battery
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- March 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem