United States › Grid › Interconnection queues › South Carolina
HYDRO · SOUTHEASTHydro project 20230829005, Lexington County
Hydro project 20230829005, Lexington County is a 47.7 MW hydro request with a signed interconnection agreement in the Southeast interconnection queue, in Lexington County, South Carolina, connecting to Dominion Energy South Carolina.
Queue statusConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2023 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 20230829005
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Dominion Energy South Carolina
- Developer
- DESC - Generation
- Connection point (POI)
- Saluda Hydro 115 kV Substation
- Location
- Lexington County, South Carolina
- Technology
- Hydro: 47.7 MW
- Total requested
- 47.7 MW
- Service type
- Network resource (NRIS)
- Study phase
- LGIA
- Queue status
- Active
- Proposed online date
- September 2023
Location
Marker shows the centre of Lexington County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Lexington County
- Solar + storage project 311, Lexington CountySolar + storage · 60.0 MW · in study
- Solar project 62, Lexington CountySolar · 75.0 MW · built
- Solar project 54, Lexington CountySolar · 75.0 MW · built
- Solar + storage project 173B, Lexington CountySolar + storage · 152 MW · withdrawn
- Solar project 20240829018, Lexington CountySolar · 150 MW · withdrawn
- Solar project 49, Lexington CountySolar · 100 MW · withdrawn
- Solar project 20230829015, Lexington CountySolar · 75.0 MW · withdrawn
- Solar project 20230828003, Lexington CountySolar · 75.0 MW · withdrawn
- Solar project 73, Lexington CountySolar · 75.0 MW · withdrawn
- Solar project 111, Lexington CountySolar · 50.0 MW · withdrawn
- Solar project 158, Lexington CountySolar · 50.0 MW · withdrawn
- Solar project 117, Lexington CountySolar · 32.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem