United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 111, Lexington County
Solar project 111, Lexington County is a 50.0 MW solar request withdrawn in the Southeast interconnection queue, in Lexington County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 111
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Lexington County, South Carolina
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 27 July 2018
- Proposed online date
- December 2020
Location
Marker shows the centre of Lexington County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Lexington County
- Hydro project 20230829005, Lexington CountyHydro Β· 47.7 MW Β· agreement signed
- Solar + storage project 311, Lexington CountySolar + storage Β· 60.0 MW Β· in study
- Solar project 62, Lexington CountySolar Β· 75.0 MW Β· built
- Solar project 54, Lexington CountySolar Β· 75.0 MW Β· built
- Solar + storage project 173B, Lexington CountySolar + storage Β· 152 MW Β· withdrawn
- Solar project 20240829018, Lexington CountySolar Β· 150 MW Β· withdrawn
- Solar project 49, Lexington CountySolar Β· 100 MW Β· withdrawn
- Solar project 20230829015, Lexington CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 20230828003, Lexington CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 73, Lexington CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 158, Lexington CountySolar Β· 50.0 MW Β· withdrawn
- Solar project 117, Lexington CountySolar Β· 32.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem