United States βΊ Grid βΊ Interconnection queues βΊ Michigan
GAS Β· MISOGas project J275, Midland County
Gas project J275, Midland County is a 700 MW gas request withdrawn in the MISO interconnection queue, in Midland County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2013 (completed)
- Withdrawn / abandonedMay 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J275
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- METC Tittabawasse 345kV Substation
- Location
- Midland County, Michigan
- Technology
- Gas: 700 MW
- Total requested
- 700 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 14 March 2013
- Proposed online date
- October 2015
- Withdrawn
- May 2017
Location
Marker shows the centre of Midland County; the queue data does not give exact sites.
Other requests in Midland County
- Solar project J2877, Midland CountySolar Β· 200 MW Β· in study
- Solar project J3059, Midland CountySolar Β· 175 MW Β· in study
- Battery storage project J3776, Midland CountyBattery storage Β· 150 MW Β· in study
- Surplus; G905Other Β· 50.0 MW Β· in study
- Onshore wind project J1194, Midland CountyOnshore wind Β· 225 MW Β· built
- Gas project G809, Midland CountyGas Β· 193 MW Β· built
- Coal project G687, Midland CountyCoal Β· 750 MW Β· withdrawn
- Gas project J3052, Midland CountyGas Β· 300 MW Β· withdrawn
- Solar project J1913, Midland CountySolar Β· 200 MW Β· withdrawn
- Solar project J1515, Midland CountySolar Β· 200 MW Β· withdrawn
- Solar project J1005, Midland CountySolar Β· 200 MW Β· withdrawn
- Solar project J2494, Midland CountySolar Β· 178 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem