United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-101, Wheeler County
Solar + storage project GEN-2023-101, Wheeler County is a 150 MW solar + storage request withdrawn in the SPP interconnection queue, in Wheeler County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-101
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Tap Stateline Demarc - Wheeler 230 kV Line
- Location
- Wheeler County, Texas
- Technology
- Solar: 150 MW Β· Battery
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2027
- Withdrawn
- August 2025
Location
Marker shows the centre of Wheeler County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem