United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AG1-059, Westmoreland County
Solar project AG1-059, Westmoreland County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Westmoreland County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2020 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-059
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Robbins 138 kV
- Location
- Westmoreland County, Pennsylvania
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 29 July 2020
- Proposed online date
- January 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Westmoreland County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Westmoreland County
- UN-KylertownSolar Β· 20.0 MW Β· agreement signed
- Battery storage project AH2-422, Westmoreland CountyBattery storage Β· 83.0 MW Β· in study
- Solar project AI1-082, Westmoreland CountySolar Β· 15.0 MW Β· in study
- Smithton Generating StationGas Β· 930 MW Β· built
- Seward 1 (Hay Road 5,6,7,8)Other Β· 525 MW Β· built
- Smithton Generation StationGas Β· 110 MW Β· built
- Smithton Generating StationGas Β· 40.0 MW Β· built
- Stahlstown-Ligonier 25 kVSolar Β· 13.8 MW Β· built
- Gas project Y2-080, Westmoreland CountyGas Β· 1,065 MW Β· withdrawn
- Gas project E17_W29, Westmoreland CountyGas Β· 640 MW Β· withdrawn
- Solar + storage project AH1-140, Westmoreland CountySolar + storage Β· 150 MW Β· withdrawn
- Gas project C11_W11, Westmoreland CountyGas Β· 88.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem