United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
SOLAR Β· SOUTHEASTSolar project 442, Cumberland County
Solar project 442, Cumberland County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Cumberland County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 442
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Cumberland County, Tennessee
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 9 June 2020
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Cumberland County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem