πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR Β· WEST

Solar project 1113, Emery County

Solar project 1113, Emery County is a 2.8 MW solar request withdrawn in the West interconnection queue, in Emery County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1113
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Riverdale-Farmington B transmission line (Tap to Hill AFB) at 138 kV
Location
Emery County, Utah
Technology
Solar: 2.8 MW
Total requested
2.8 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
15 February 2019
Proposed online date
January 2019

Location

Marker shows the centre of Emery County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Emery County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem