United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2021-075, Camp County
Solar + storage project GEN-2021-075, Camp County is a 300 MW solar + storage request withdrawn in the SPP interconnection queue, in Camp County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2021 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-075
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- CAMPCOR4 138kV Substation
- Location
- Camp County, Texas
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 19 May 2021
- Proposed online date
- December 2027
- Withdrawn
- April 2025
Location
Marker shows the centre of Camp County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem