United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OTHER Β· PJM

Evansville Biomass

Evansville Biomass is a 6.0 MW other request withdrawn in the PJM interconnection queue, in Berks County, Pennsylvania, connecting to ME.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandonedAug 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R42
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ME
Connection point (POI)
Moselem 69kV
Location
Berks County, Pennsylvania
Technology
Other: 6.0 MW
Total requested
6.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
21 November 2006
Proposed online date
March 2009
Withdrawn
August 2009

Location

Marker shows the centre of Berks County; the queue data does not give exact sites.