πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

ONSHORE WIND Β· MISO

Onshore wind project J601, Lapeer County

Onshore wind project J601, Lapeer County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Lapeer County, Michigan.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J601
Grid region
MISO (Midcontinent)
Connection point (POI)
Kilgore - Micah 120kV with the line distance 1 mile from Kilgore
Location
Lapeer County, Michigan
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
9 May 2016
Proposed online date
September 2018
Withdrawn
January 2018

Location

Marker shows the centre of Lapeer County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Lapeer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem