United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J1661, Lapeer County
Solar project J1661, Lapeer County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Lapeer County, Michigan, connecting to ITC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedFeb 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1661
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC
- Connection point (POI)
- Imlay Pump 120kV Substation
- Location
- Lapeer County, Michigan
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 June 2020
- Proposed online date
- September 2023
- Withdrawn
- February 2021
Location
Marker shows the centre of Lapeer County; the queue data does not give exact sites.
Other requests in Lapeer County
- Onshore wind project J3866, Lapeer CountyOnshore wind Β· 300 MW Β· in study
- Solar project J3472, Lapeer CountySolar Β· 200 MW Β· in study
- Solar project J3828, Lapeer CountySolar Β· 100 MW Β· in study
- Solar project J3876, Lapeer CountySolar Β· 150 MW Β· withdrawn
- Onshore wind project J601, Lapeer CountyOnshore wind Β· 100 MW Β· withdrawn
- Solar project J839, Lapeer CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J3875, Lapeer CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem