COAL Β· MISOCoal project G293, Buffalo County
Coal project G293, Buffalo County is a 400 MW coal request withdrawn in the MISO interconnection queue, in Buffalo County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2002 (completed)
- Withdrawn / abandonedDec 2004 (project stopped here)
- ConsentedDec 2004 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G293
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Buffalo County, Wisconsin
- Technology
- Coal: 400 MW
- Total requested
- 400 MW
- Queue status
- Withdrawn
- Entered queue
- 18 December 2002
- Agreement signed
- 28 December 2004
- Proposed online date
- December 2004
- Withdrawn
- December 2004
Location
Marker shows the centre of Buffalo County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Buffalo County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem