United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· MISOSolar project J2483, Amite County
Solar project J2483, Amite County is a 105 MW solar request withdrawn in the MISO interconnection queue, in Amite County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2483
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- GILLSBURG SS (CE)-LIBERTY115 Kv
- Location
- Amite County, Mississippi
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 9 September 2022
- Proposed online date
- November 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Amite County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Amite County
- Solar project J3987, Amite CountySolar Β· 165 MW Β· in study
- Solar project J3913, Amite CountySolar Β· 140 MW Β· in study
- Solar + storage project J3231, Amite CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project J2900, Amite CountySolar + storage Β· 400 MW Β· withdrawn
- Solar + storage project J3105, Amite CountySolar + storage Β· 400 MW Β· withdrawn
- Solar + storage project J2898, Amite CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project J3097, Amite CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project J2023, Amite CountySolar Β· 94.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem