United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Gowanus Bay Energy Storage 1

Gowanus Bay Energy Storage 1 is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Kings County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1240
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
Astoria Generating Company, L.P.
Connection point (POI)
Gowanus 138 kV substation (utilizing the existing feeder 42421)
Location
Kings County, New York
Technology
Battery: 100 MW
Total requested
100 MW
Queue status
Withdrawn
Entered queue
3 September 2021

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Kings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem