United States βΊ Grid βΊ Interconnection queues βΊ Arizona
BATTERY STORAGE Β· WESTBattery storage project SP102
Battery storage project SP102 is a 43.9 MW battery storage request built and operating in the West interconnection queue, connecting to Arizona Public Service.
Request details
- Queue ID
- SP102
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Arizona Public Service
- Connection point (POI)
- Saugaro 115kV (Q228)
- Location
- Arizona
- Technology
- Battery: 43.9 MW
- Total requested
- 43.9 MW
- Service type
- Other
- Study phase
- In-Service
- Queue status
- Operational
- Entered queue
- 21 June 2021
- Proposed online date
- June 2023
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem