Solar project Q27, San Bernardino County

Solar project Q27, San Bernardino County is a 515 MW solar request withdrawn in the West interconnection queue, in San Bernardino County, California, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedNov 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q27
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Victorville-Rinaldi 500 kV line
Location
San Bernardino County, California
Technology
Solar: 515 MW
Total requested
515 MW
Queue status
Withdrawn
Entered queue
17 April 2012
Proposed online date
December 2016
Withdrawn
November 2013

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem