United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

BATTERY STORAGE Β· MISO

Battery storage project J1493, Hubbard County

Battery storage project J1493, Hubbard County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Hubbard County, Minnesota, connecting to GREAT RIVER ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedJan 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1493
Grid region
MISO (Midcontinent)
Utility / transmission owner
GREAT RIVER ENERGY
Connection point (POI)
Hubbard 115kV
Location
Hubbard County, Minnesota
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
18 June 2020
Proposed online date
October 2023
Withdrawn
January 2021

Location

Marker shows the centre of Hubbard County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Hubbard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem