United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project R64, Carroll County

Onshore wind project R64, Carroll County is a 70.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Carroll County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2011 (completed)
  2. Withdrawn / abandonedJul 2013 (project stopped here)
  3. ConsentedJul 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R64
Grid region
MISO (Midcontinent)
Connection point (POI)
Victory Substation
Location
Carroll County, Iowa
Technology
Wind: 70.0 MW
Total requested
70.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
8 September 2011
Agreement signed
2 July 2013
Proposed online date
December 2010
Withdrawn
July 2013

Location

Marker shows the centre of Carroll County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Carroll County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem