United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project R64, Carroll County
Onshore wind project R64, Carroll County is a 70.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Carroll County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2011 (completed)
- Withdrawn / abandonedJul 2013 (project stopped here)
- ConsentedJul 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R64
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Victory Substation
- Location
- Carroll County, Iowa
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 8 September 2011
- Agreement signed
- 2 July 2013
- Proposed online date
- December 2010
- Withdrawn
- July 2013
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem