United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project R57, Carroll County
Onshore wind project R57, Carroll County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Carroll County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2009 (completed)
- Withdrawn / abandonedJan 2014 (project stopped here)
- ConsentedJan 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R57
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Victory 161 kV Substation
- Location
- Carroll County, Iowa
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 30 March 2009
- Agreement signed
- 6 January 2014
- Proposed online date
- January 2010
- Withdrawn
- January 2014
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem