SOLAR + STORAGE · MISO

Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar

Replacing 160 MW of Solar with 80 MW of Solar and 90 MW of BESS; Bell Solar is a 170 MW solar + storage request in interconnection study in the MISO interconnection queue, in Shiawassee County, Michigan, connecting to METC.

Queue statusIn planning
  1. PlanningQueued May 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R5063
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
BELL ROAD - CORNELL 138.0kV
Location
Shiawassee County, Michigan
Technology
Solar: 170 MW · Battery
Total requested
170 MW
Queue status
Active
Entered queue
9 May 2025

Location

Marker shows the centre of Shiawassee County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Shiawassee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem