United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
SOLAR Β· SPPSolar project GEN-2022-032, Kimball County
Solar project GEN-2022-032, Kimball County is a 155 MW solar request withdrawn in the SPP interconnection queue, in Kimball County, Nebraska, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-032
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Laramie-Sidney 345 kV
- Location
- Kimball County, Nebraska
- Technology
- Solar: 155 MW
- Total requested
- 155 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 22 June 2022
- Proposed online date
- February 2028
- Withdrawn
- June 2023
Location
Marker shows the centre of Kimball County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem