United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR + STORAGE Β· PJMBR-Allentown
BR-Allentown is a 3.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Berks County, Pennsylvania, connecting to ME.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJan 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-430
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Moselem 13.2 kV
- Location
- Berks County, Pennsylvania
- Technology
- Solar: 3.0 MW Β· Battery
- Total requested
- 3.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 31 March 2020
- Proposed online date
- September 2022
- Withdrawn
- January 2024
Location
Marker shows the centre of Berks County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Berks County
- Ontelaunee Power Generating PlantBattery storage Β· 20.0 MW Β· agreement signed
- Solar + storage project AI2-435, Berks CountySolar + storage Β· 20.0 MW Β· in study
- Solar project AI2-414, Berks CountySolar Β· 12.5 MW Β· in study
- Solar project AI2-458, Berks CountySolar Β· 5.8 MW Β· in study
- Solar project AI2-459, Berks CountySolar Β· 5.8 MW Β· in study
- Furnace View FarmsSolar Β· 5.0 MW Β· suspended
- Gas project A18, Berks CountyGas Β· 557 MW Β· built
- Birdsboro Power LLC Generation FacilityGas Β· 450 MW Β· built
- Ontelaunee Power Generating PlantGas Β· 38.9 MW Β· built
- Birdsboro Power LLC Generation FacilityGas Β· 35.0 MW Β· built
- Ontelaunee Power Generating PlantGas Β· 34.1 MW Β· built
- Evergreen Community PowerOther Β· 30.0 MW Β· built