United States βΊ Grid βΊ Interconnection queues βΊ Maryland
GAS Β· PJMGas project G30_W55
Gas project G30_W55 is a 500 MW gas request withdrawn in the PJM interconnection queue, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2001 (completed)
- Withdrawn / abandonedNov 2002 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G30_W55
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Kempton 500 kV
- Location
- Maryland
- Technology
- Gas: 500 MW
- Total requested
- 500 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 May 2001
- Proposed online date
- January 2006
- Withdrawn
- November 2002
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem