United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

GAS Β· PJM

Gas project G30_W55

Gas project G30_W55 is a 500 MW gas request withdrawn in the PJM interconnection queue, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2001 (completed)
  2. Withdrawn / abandonedNov 2002 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G30_W55
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Kempton 500 kV
Location
Maryland
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
29 May 2001
Proposed online date
January 2006
Withdrawn
November 2002

Location

No county location in the queue data.

Power plants in Maryland Β· Transmission lines in Maryland

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem