United States › Grid › Interconnection queues › Virginia

SOLAR · PJM

Stagecoach Solar

Stagecoach Solar is a 60.0 MW solar request built and operating in the PJM interconnection queue, in Halifax County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Sep 2016 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AC1-075
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Perth-Hickory Grove 115kV
Location
Halifax County, Virginia
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
29 September 2016
Proposed online date
December 2021
Came online
April 2021

Location

Marker shows the centre of Halifax County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Halifax County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem