United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2024-036, Colfax County
Onshore wind project GEN-2024-036, Colfax County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Colfax County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2024 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-036
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Schuyler- North Bend 115 kV line
- Location
- Colfax County, Nebraska
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 October 2024
- Proposed online date
- December 2029
- Withdrawn
- July 2025
Location
Marker shows the centre of Colfax County; the queue data does not give exact sites.
Other requests in Colfax County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem