United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2019-005, Polk County
Solar project GEN-2019-005, Polk County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Polk County, Missouri, connecting to SPRM.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedNov 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-005
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPRM
- Connection point (POI)
- Morgan-Brookline 345kV transmission line
- Location
- Polk County, Missouri
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 April 2019
- Proposed online date
- December 2022
- Withdrawn
- November 2019
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Other requests in Polk County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem