πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR Β· SOUTHEAST

Solar project GI-88, Polk County

Solar project GI-88, Polk County is a 86.5 MW solar request withdrawn in the Southeast interconnection queue, in Polk County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-88
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
Eudora 69 kV
Location
Polk County, Missouri
Technology
Solar: 86.5 MW
Total requested
86.5 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
20 December 2019
Proposed online date
August 2025

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem