United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AF2-263, Shelby County
Solar project AF2-263, Shelby County is a 98.0 MW solar request withdrawn in the PJM interconnection queue, in Shelby County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-263
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Developer
- AEUG Shelby Solar, LLC
- Connection point (POI)
- Shelby 138 kV
- Location
- Shelby County, Ohio
- Technology
- Solar: 98.0 MW
- Total requested
- 98.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 27 March 2020
- Proposed online date
- July 2022
- Withdrawn
- June 2024
Location
Marker shows the centre of Shelby County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem