United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
ONSHORE WIND Β· SPPOnshore wind project GEN-2008-124T, Cherokee County
Onshore wind project GEN-2008-124T, Cherokee County is a 42.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Cherokee County, Oklahoma, connecting to SPS.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedOct 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2008-124T
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- TC-Keyes Texas County 69kV
- Location
- Cherokee County, Oklahoma
- Technology
- Wind: 42.0 MW
- Total requested
- 42.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Withdrawn
- October 2013
Location
Marker shows the centre of Cherokee County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem