United States βΊ Grid βΊ Interconnection queues βΊ Kansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2021-013, Lincoln County
Battery storage project GEN-2021-013, Lincoln County is a 74.9 MW battery storage request withdrawn in the SPP interconnection queue, in Lincoln County, Kansas, connecting to MIDW.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedOct 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-013
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- MIDW
- Connection point (POI)
- Smoky Hills Tap 230kV
- Location
- Lincoln County, Kansas
- Technology
- Battery: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 April 2021
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- October 2024
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Other requests in Lincoln County
- Onshore wind project GEN-2010-057, Lincoln CountyOnshore wind Β· 201 MW Β· built
- Battery storage project GEN-2023-149, Lincoln CountyBattery storage Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2008-068, Lincoln CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2008-061, Lincoln CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem