United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· MISOSolar + storage project J2321, Lamar County
Solar + storage project J2321, Lamar County is a 180 MW solar + storage request withdrawn in the MISO interconnection queue, in Lamar County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2321
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Columbia to Plant Morrow 161kV
- Location
- Lamar County, Mississippi
- Technology
- Solar: 180 MW Β· Battery
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 May 2022
- Proposed online date
- April 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Lamar County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Lamar County
- Solar project J791, Lamar CountySolar Β· 52.0 MW Β· agreement signed
- Solar project IC-986, Lamar CountySolar Β· 250 MW Β· suspended
- Solar project IC-1113, Lamar CountySolar Β· 200 MW Β· suspended
- Gas project J1249, Lamar CountyGas Β· 600 MW Β· built
- Solar project J473, Lamar CountySolar Β· 52.0 MW Β· built
- Sumrall SolarSolar Β· 50.0 MW Β· built
- Gas project IC-756, Lamar CountyGas Β· 550 MW Β· withdrawn
- Solar + storage project IC-1141, Lamar CountySolar + storage Β· 200 MW Β· withdrawn
- Solar project IC-1029, Lamar CountySolar Β· 125 MW Β· withdrawn
- Solar project IC-682, Lamar CountySolar Β· 120 MW Β· withdrawn
- Solar project IC-1021, Lamar CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-722, Lamar CountySolar Β· 55.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem