United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMAlameda Solar
Alameda Solar is a 70.0 MW solar request withdrawn in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-190
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Elk Run D.P.-Gainesville 230 kV
- Location
- Fauquier County, Virginia
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 18 March 2019
- Proposed online date
- December 2027
- Withdrawn
- March 2025
Location
Marker shows the centre of Fauquier County; the queue data does not give exact sites.
Other requests in Fauquier County
- Remington BESSBattery storage Β· 100 MW Β· agreement signed
- Battery storage project AH2-084, Fauquier CountyBattery storage Β· 125 MW Β· in study
- Solar project AI2-079, Fauquier CountySolar Β· 40.7 MW Β· in study
- Solar project AH1-345, Fauquier CountySolar Β· 14.0 MW Β· in study
- Solar project AB2-029, Fauquier CountySolar Β· 19.8 MW Β· built
- Remington GT4Gas Β· 15.0 MW Β· built
- Remington GT1Gas Β· 15.0 MW Β· built
- Remington GT3Gas Β· 15.0 MW Β· built
- Remington GT2Gas Β· 15.0 MW Β· built
- Gas project W1-074, Fauquier CountyGas Β· 610 MW Β· withdrawn
- Gas project X3-076, Fauquier CountyGas Β· 510 MW Β· withdrawn
- Fitch SolarSolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem