United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project J556, Renville County
Onshore wind project J556, Renville County is a 102 MW onshore wind request withdrawn in the MISO interconnection queue, in Renville County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2016 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J556
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Panther 230kV Substation
- Location
- Renville County, Minnesota
- Technology
- Wind: 102 MW
- Total requested
- 102 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 4 April 2016
- Proposed online date
- December 2019
- Withdrawn
- April 2019
Location
Marker shows the centre of Renville County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Renville County
- Solar + storage project J1846, Renville CountySolar + storage Β· 200 MW Β· in study
- Solar project J2087, Renville CountySolar Β· 125 MW Β· in study
- Battery storage project J3259, Renville CountyBattery storage Β· 250 MW Β· withdrawn
- Solar project J1568, Renville CountySolar Β· 100 MW Β· withdrawn
- Solar project J770, Renville CountySolar Β· 90.0 MW Β· withdrawn
- Onshore wind project H070, Renville CountyOnshore wind Β· 85.0 MW Β· withdrawn
- Solar project J1645, Renville CountySolar Β· 80.0 MW Β· withdrawn
- Onshore wind project H065, Renville CountyOnshore wind Β· 40.0 MW Β· withdrawn
- Solar project J322, Renville CountySolar Β· 40.0 MW Β· withdrawn
- Solar project J784, Renville CountySolar Β· 40.0 MW Β· withdrawn
- Solar project J769, Renville CountySolar Β· 33.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem