United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· PJMOnshore wind project W2-044, Whitley County
Onshore wind project W2-044, Whitley County is a 101 MW onshore wind request withdrawn in the PJM interconnection queue, in Whitley County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedJan 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W2-044
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Columbia 138kV
- Location
- Whitley County, Indiana
- Technology
- Wind: 101 MW
- Total requested
- 101 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 June 2010
- Proposed online date
- September 2011
- Withdrawn
- January 2011
Location
Marker shows the centre of Whitley County; the queue data does not give exact sites.
Other requests in Whitley County
- Solar project AI2-162, Whitley CountySolar Β· 48.0 MW Β· in study
- Solar project AI2-412, Whitley CountySolar Β· 12.0 MW Β· in study
- Solar project AI2-413, Whitley CountySolar Β· 12.0 MW Β· in study
- Dover Solar FacilitySolar Β· 55.0 MW Β· suspended
- Solar project AG2-173, Whitley CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project W3-024, Whitley CountyOnshore wind Β· 149 MW Β· withdrawn
- Battery storage project AH1-298, Whitley CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project AG1-417, Whitley CountySolar Β· 50.0 MW Β· withdrawn
- Solar project AG1-418, Whitley CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem