United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Fuller Storage

Fuller Storage is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to CHG&E.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1119
Grid region
NYISO (New York)
Utility / transmission owner
CHG&E
Developer
Granada Solar, LLC
Connection point (POI)
East Walden 115kV
Location
Orange County, New York
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
4 December 2020

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem