United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOFuller Storage
Fuller Storage is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to CHG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1119
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHG&E
- Developer
- Granada Solar, LLC
- Connection point (POI)
- East Walden 115kV
- Location
- Orange County, New York
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 4 December 2020
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Sugar Loaf Energy Storage IBattery storage · 300 MW · in study
- Arch 4Battery storage · 150 MW · in study
- Farmhouse BESSBattery storage · 150 MW · in study
- Arch 3Battery storage · 100 MW · in study
- Little Pond SolarSolar · 20.0 MW · in study
- CPV Valley Energy CenterGas · 691 MW · built
- CPV Valley Energy CenterGas · 691 MW · built
- Swinging Bridge Unit 3Hydro · 1.2 MW · built
- Swinging Bridge Unit 3Hydro · 1.2 MW · built
- CPV Valley IIGas · 820 MW · withdrawn
- Wawayanda Energy CenterGas · 500 MW · withdrawn
- Sugar Loaf Energy Storage IIBattery storage · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem