SOLAR Β· SOUTHEASTSolar project IC-570, Pike County
Solar project IC-570, Pike County is a 23.0 MW solar request withdrawn in the Southeast interconnection queue, in Pike County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2016 (completed)
- Withdrawn / abandonedMar 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-570
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Troy Substation 115 kV Bus
- Location
- Pike County, Alabama
- Technology
- Solar: 23.0 MW
- Total requested
- 23.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 December 2016
- Withdrawn
- March 2017
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.
Other requests in Pike County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem