United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· WESTSolar project 1063, Siskiyou County
Solar project 1063, Siskiyou County is a 5.0 MW solar request withdrawn in the West interconnection queue, in Siskiyou County, California, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1063
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- McCloud substation
- Location
- Siskiyou County, California
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 16 August 2018
- Proposed online date
- September 2019
Location
Marker shows the centre of Siskiyou County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Siskiyou County
- Battery storage project T2-072, Siskiyou CountyBattery storage Β· 150 MW Β· in study
- Other project 54, Siskiyou CountyOther Β· 10.0 MW Β· built
- Hydro project 497, Siskiyou CountyHydro Β· 0.0 MW Β· built
- Battery storage project C3-169, Siskiyou CountyBattery storage Β· 150 MW Β· withdrawn
- Whitehorse Mountain Wind Power PlantOnshore wind Β· 132 MW Β· withdrawn
- Geothermal project 431, Siskiyou CountyGeothermal Β· 12.0 MW Β· withdrawn
- Other project 328, Siskiyou CountyOther Β· 10.0 MW Β· withdrawn
- Solar project 1042, Siskiyou CountySolar Β· 2.5 MW Β· withdrawn
- Solar project 1041, Siskiyou CountySolar Β· 2.5 MW Β· withdrawn
- Solar project 669, Siskiyou CountySolar Β· 2.0 MW Β· withdrawn
- Gas project 288, Siskiyou CountyGas Β· 0.1 MW Β· withdrawn
- Hydro project 449, Siskiyou CountyHydro Β· 0.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem